Zhongxinwang on March 11 environmental protection department vice-minister the tensity armed forces accepts Chinese and foreign reporter on the current environmental protection situation and the duty when the special interview indicated today that to did not conform to the legal rule items of basic construction to establish the firewall, induced is four does not approve, three strict. four do not approve, namely the national public proclamation elimination, forbids to construct does not conform to the industrial policy all not to approve; The environmental pollution is heavy, the product quality is low, the energy consumption, the material and energy consumption consume high, specially the pollutant discharge cannot attain a designated standard the project all does not approve; The environment quality cannot satisfy the environment function request, although is the good project, but your locality’s environment quality already could not satisfy the environment function request, already did not have the total quantity target, also all does not approve; If the items of basic construction located at the nature protection area, the core area, the buffer project all do not approve.
time loans third anniversary foreword Buffett to go out crisis AIG: Tumbles giant The State Council deploys the vegetables reserve Development and Planning Commission ferments to release the low-carbon standard as soon as possible Bank charge innovation quickest in September appears The national territory department will announce the idle land treatment opinion The broad electricity bureau arranges the state-level broad electric network company Country US Gao Guan reprimands yellow rises from poverty and obscurity resorts to all means micro abundant so attacks the house price is only separates boots flexure to itch three strict, namely the strict limit involves to the tap water source protectorate, the nature protection area, the scenic spot area as well as the important ecology function area project strict limit; The strict control consumes energy high, is in the industry development the energy consumption, the material and energy consumption, the pollutant discharge amount is big, strict limit examination, and must firmly cease already the project which eliminates take the so-called technological transformations, the drawing domestic demand as the nominal project; Third strict, according to the total quantity control’s request, takes strictly the pollutant discharge total quantity the region, the profession, the enterprise development constraints. The tensity armed forces stressed that involves to cannot examine and approve and the strict control project, as well as two high capital produces can the surplus project, this is a red line, is also a high tension line, cannot bump, cannot the overflight.
Post Details
Posted on September 3, 2010
at 9:39 am
Written / posted by: admin
Filed under: Uncategorized